good elephant pottery
  • blog
  • recent work
  • where to buy
  • the potter
  • school
  • contact
  • mailing list

The New Kiln's Name

5/22/2013

0 Comments

 
Picture
The new kiln landed on my driveway on May 16. On May 18, it was moved into the studio. I wrangled up some free labor to help me, in the form of potters (and some of their spouses) who may be installing kilns in their own houses someday. In exchange for some heavy lifting, they got a hands-on glimpse of their future. Plus dinner afterwards at one of our favorite local eateries. Big thanks to Karen Arrington, Amy Castner, Matt Udvardy, Alan and Karen Dowdy, Janet Evander, and Mark Wimer!

We all marveled at how clearly written the installation instructions were. That's just another reason why I tell everyone to buy L&L Kilns. The whole process took about two hours, and went very smoothly. (Photos by Amy Castner and Janet Evander, click on the thumbnails for larger photos and captions)
When I bought my older kiln back in 2004, it was replacing a little 2-section, 18 inch wide kiln. I had both kilns in my studio for about a week, one much larger than the other, wearing matching metallic suits. During that week the kilns were named Dr. Evil and Mini-Me. Mini-Me soon departed for his new home, and Dr. Evil has been my trusty friend ever since. While we were installing the new kiln, I mentioned that I needed a name for the new kiln. As soon as Matt said his suggestion out loud, I knew it was the only answer. The new kiln's name is Number 2. Number 2 is Dr. Evil's equal, if not his superior. But Dr. Evil is still on top of the organization chart here. 
Picture
0 Comments

Studio of My Dreams

5/6/2013

25 Comments

 
I am starting this post with a picture of my old studio:
Picture
 
People who know me in person have often heard me refer to my studio as a "cave." Since 2002, I have been making pots in the basement of my 78-year-old house. I have always appreciated that the space was essentially free. It came with the house, and I didn't need it for anything else. It has been great for the bottom line. But it was a 78-year-old basement. It had no natural light. It was dark and grimy. There were areas that could rightfully be called "makeshift" or "weird," and other areas that could be called "gross" or "scary."

All of those issues could be tolerated. But here's what I couldn't live with: I had outgrown the capacity of the space. I wrote about this last summer. To me, the source of the bottlenecks was clear. I could only produce as much pottery as one kiln could fire. In order to make room for a second kiln, I'd have to rearrange. I did not want to add any more makeshift to the situation. I was feeling confident that the business was going to last for the long term. Did I want to live with weird and dark that long? Working as a potter gives you a lot of time to think. So after months of contemplating all of the paths I could choose, I decided that I would not just make room for a second kiln. Instead I would make a bigger investment, and create a space that would work for me all the way into retirement. 

It took me over a week to remove everything from the basement. Here's what it looked like when empty. The space in the foreground was my old studio, roughly 350 square feet. It was separated from the other half of the basement by ugly, dark wood-paneling walls.  
Picture
 
The walls are gone now. The creepy corner behind the chimney does not exist anymore. All of the exterior walls, and the staircase, were given a fresh coat of paint. The space on the far side of the stairs was not part of my studio before. I am going to use it now. As you'll see in a later photo, that space will be used to store and display the finished pots. I am visualizing boxes of clay stored under the stairs. Or maybe packing peanuts. Overall, the studio has grown to almost 600 square feet.  
Picture
 
Here and there were remnants of an old drop ceiling. Definitely gross. The ceiling tiles were older than the invention of aluminum. They were installed onto wooden strips with lots of messy leveling shims.
Picture
 
All of the ceiling tiles and wooden strips were removed. At the suggestion of my contractor, he sprayed all of the exposed rafters with a coat of white paint. This makes the entire space feel taller and brighter, and all of the pipes and conduits seem to have disappeared.
Picture
 
This was the only troublesome part of the renovation: vinyl-asbestos floor tiles. Very common in houses this age. Don't worry, this is not as hazardous as it sounds. They were generally in good condition, and I had never aggressively disturbed them. Still, it's a good idea to cover them up, so they can remain undisturbed. 
Picture
 
The new flooring is a solid vinyl product that is intended for garages. It's very different from the vinyl floor in my kitchen. There is no fabric backing, and the surface is much harder. I have dragged heavy furniture across it, and the floor doesn't seem to notice. The surface is slightly textured, it's seems to be a good balance of "easy to mop" and "non-slip." Time will tell if it holds up well in a pottery studio, but so far I am impressed. 
Picture
 
Although I've often complained about the lack of windows, the truth is my basement has four windows, which had been boarded up by a previous owner.
Picture
 
The amount of light coming in through the new windows is so bright, I had trouble photographing them. And you are not imagining, the glass has a pebbly texture that you can't see through. As much as I wanted some natural light, I did not want my studio to be visible from outside. I did not know that "privacy glass" existed until the window salesperson suggested it, at which point I heard the British-accented character from the beer commercial shouting "Brilliant!"
Picture
 
The gaps that surrounded the old door were so big, during the winter months the cold wind would just show itself in. The door opening is a non-standard size, and also slightly distorted, so whoever installed this door did their best to make an off-the-shelf door fit.
Picture
 
The new door was made to the correct size, and the weather-sealing around it was pitched as "like a refrigerator door." As an added bonus, I got another window, with more privacy glass. Brilliant!
Picture
 
You can probably guess what the blue tape, the new 60 amp circuit, and the swinging arm bracket for the vent hood mean. The new kiln has been ordered and is coming soon!
Picture
 
I love shelving. Shelving makes everything better. You can't have enough shelving.
Picture
 
I love wheels. Wheels make everything better. You can't have enough wheels.
Picture
 
Oh my goodness, shelving on wheels. My heart flutters. I can't wait to fill this up with pots. In the old studio, the shelves where the pots dried were about 15 feet from the kiln. Loading the kiln involved a lot of walking back and forth. The first time I roll this entire cart over to the kilns to begin loading, I'm going to faint from happiness. And although this cart looks fairly compact, it actually gives me almost twice as much drying space as I had before.
Picture
 
With all the additional square footage, I created a new area for storing the finished pottery, packing and shipping, and taking photographs. I used to do this in a bedroom on the first floor. Try to imagine ... every time I unloaded the kiln, I put the pots into a plastic bin and carried them up the stairs in two or three trips. Now I will unload the pots onto a new utility cart (pictured), and roll them over to here. Oh, how I love shelves on wheels. Yikes, my inventory is really low! I need to get back to work. 
Picture
 
Right after all the renovation was finished, the space looked so pretty when it was empty, I almost didn't want to fill it back up, or get anything dirty. But that didn't last long. I missed my studio. Now that I have put everything back, I think it looks amazing. And I can't wait to get it dirty.
Picture
 
I shut down the studio on April 1, and I am going back to work tomorrow, May 7. It was a long five weeks. Lots of noise. Days of high stress. Days of utter boredom. Lots of excitement, anticipation, relief, and joy.

What I really love about the new studio, aside from the newfound spaciousness and light, is that it feels like a commercial space. A place for serious work. Not at all like an old residential basement. I am looking forward to coming down the stairs to this studio everyday.

Many thanks and praise to DE Thomason Construction Company, who handled most of this project, and did a fabulous job. And thanks also for great work done by Thompson Creek Window Company, H-TWO-O Plumbing, Tatson Electric, and APRO Enterprises, Inc. 
25 Comments

    author

    Mea Rhee (mee-uh ree),
    ​the potter behind Good Elephant Pottery


    upcoming shows

    TBD

    join the herd

    Receive email notices about upcoming shows/events, and/or the online school.


    Follow me on
    ​Facebook and
    Instagram

    RSS Feed


    categories

    All
    Classes
    In The Studio
    Running A Business
    Shows
    The Art Festival Plan
    The Hourly Earnings Project

    archives

    December 2020
    November 2020
    October 2020
    August 2020
    April 2020
    February 2020
    January 2020
    December 2019
    November 2019
    September 2019
    July 2019
    April 2019
    March 2019
    February 2019
    January 2019
    November 2018
    October 2018
    September 2018
    July 2018
    June 2018
    May 2018
    April 2018
    January 2018
    December 2017
    November 2017
    October 2017
    September 2017
    August 2017
    June 2017
    May 2017
    April 2017
    February 2017
    December 2016
    November 2016
    October 2016
    August 2016
    July 2016
    June 2016
    May 2016
    March 2016
    January 2016
    December 2015
    October 2015
    September 2015
    August 2015
    July 2015
    June 2015
    May 2015
    April 2015
    March 2015
    February 2015
    January 2015
    December 2014
    November 2014
    October 2014
    September 2014
    August 2014
    July 2014
    June 2014
    May 2014
    April 2014
    March 2014
    February 2014
    January 2014
    December 2013
    November 2013
    October 2013
    September 2013
    August 2013
    July 2013
    June 2013
    May 2013
    April 2013
    March 2013
    February 2013
    January 2013
    December 2012
    November 2012
    October 2012
    September 2012
    August 2012
    July 2012
    June 2012
    May 2012
    April 2012
    March 2012
    February 2012
    January 2012
    December 2011
    November 2011
    October 2011
    September 2011
    August 2011
    July 2011
    June 2011
    May 2011
    April 2011
    March 2011
    February 2011
    January 2011
    December 2010
    November 2010
    October 2010
    September 2010
    August 2010
    July 2010
    June 2010
    May 2010
    April 2010

Powered by Create your own unique website with customizable templates.